10吨绞盘英文说明书
- 文件大小:1.09MB
- 浏览次数:
- 发布时间:2012-10-19
本资料包含doc文件1个,下载需要1积分
10吨绞盘英文说明书 Do not disengage clutch under load.
Engage clutch to prevent drum running and cable kinking, when winch is not working.
Stay out from under and away from raised loads.
Stand clear of cable while pulling. Do not try to guide cable.
Do not exceed maximum line pull ratings shown in table.
The pressure and flow of hydraulic system should reach the shown in table.
The cable should be arranged on the drum neatly.
Do not use winch to lift, support or otherwise transport people.
A minimum of 5 wraps of cable around the drum barrel is necessary to hold the load.
When you change the rope, you should check intensity according load.
Make sure that all equipment, including the winch and cables, is maintained properly.
Avoid shock loads. This type of load imposes a strain on the winch many times the actual weight of the
load and can cause failure of the cable or of the winch.
Winch operators must be trained in the proper, safe operation of the winch.
- 1北京德外危改回迁楼G1区装修施工组织设计
- 22011年一级建造师资格考试公路实务典型例题
- 3GB/T 16840.4-1997 电气火灾原因技术鉴定方法金相法
- 4鼠标三维建模proe源文件及渲染图
- 5B07-F02切割机(手动单电机)CAD图纸
- 6印刷机装配图
- 7监理怎样阅读地质勘察报告
- 8FZ/T 92013-1992 SL系列上罗拉轴承
- 9××房地产企业管理咨询项目建议书
- 10工程监理规划是开展施工监理工作的基础
- 11烟气余热锅炉
- 12808.再谈混凝土裂缝的质量控制及处理(摘录自建筑施工09年7期564-565页)
- 137.外墙外贴坚壳珍珠岩板施工技术(摘录自《建筑技术》06年10月第763-764页)
- 14BQB450-2003电镀锡钢板及钢带
- 15WS 364.4-2011 卫生信息数据元值域代码 第4部分:健康史